Interdisciplinary collaboration - lower carbon footprint, early project delivery

Highway 4, between the municipalities of Roa and Gran, there were several challenges that needed to be solved. For instance, how to build a four-lane highway through a swamp without destroying it? In addition, there turned out to be a lot of quick clay in the ground, a special kind of clay that is prone to collapse and become liquid under pressure. Furthermore, a limited carbon footprint was an important project requirement.

Read through this case study to get further insights. 

Project facts:

  • New four-lane motorway that will increase capacity and reduce the risk of accidents on the Roa-Gran stretch.

  • The client is the Norwegian Public Roads Administration. Turnkey contracted with the combination of Hæhre-Isachsen as contractor and COWI as designer.

  • The budget is just over NOK 700 million.

  • Construction start: September 2021, opening November 2023.

Similar documents

Infographic: Dig into more efficient earthmoving
Document

Infographic: Dig into more efficient earthmoving

Eliminate costly inefficiencies like rework! This infographic reveals hidden costs of manual methods...
Read document
Trimble Novapoint civil engineering design brochure
Document

Trimble Novapoint civil engineering design brochure

A successful construction of infrastructure projects, require a detailed, coherent infrastructure mo...
Read document
Kentucky Transportation Cabinet modernizes bridge delivery with DOT construction project management solutions
Document

Kentucky Transportation Cabinet modernizes bridge delivery with DOT construction project management solutions

See how the Kentucky Transportation Cabinet uses Trimble's DOT construction project management solut...
Read document