Skip to content

Building smarter with BIM: Delivering accuracy and efficiency at Lake Wylie High School

Telge Projects, a Pune-based BIM partner, used Tekla Structures to deliver structural steel detailing for Lake Wylie High School in York, South Carolina. The large-scale educational facility required complex coordination across wall framing, joist systems and rooftop mechanical units.

Leveraging advanced 3D BIM modeling, clash detection and IFC integration, the Telge team resolved multi-discipline conflicts before fabrication, reducing costly rework. Comprehensive layout drawings and continuous collaboration with the Engineer of Record, architects and MEP teams ensured precision at every phase.

The result: a fully coordinated structural steel model delivered two weeks ahead of schedule, with CNC-ready outputs enabling smooth fabrication and erection. This project demonstrates how BIM-driven workflows improve constructability, accuracy and project efficiency in modern school construction.

Similar documents

Banner Health scales visibility and budget control with healthcare construction project management
Document

Banner Health scales visibility and budget control with healthcare construction project management

Learn how Banner Health uses PMIS technology to gain visibility and control of its capital program....
Read document
University of Pennsylvania combines sustainable design with historic preservation
Document

University of Pennsylvania combines sustainable design with historic preservation

Learn how the University of Pennsylvania integrated sustainable design into historic campus preserva...
Read document
Kentucky Transportation Cabinet modernizes bridge delivery with DOT construction project management solutions
Document

Kentucky Transportation Cabinet modernizes bridge delivery with DOT construction project management solutions

See how the Kentucky Transportation Cabinet uses Trimble's DOT construction project management solut...
Read document