Skip to content
Aerial view of an excavator and bulldozer on a sandy construction site, featuring Trimble Earthworks machine control technology.

Civil construction

It’s a new era of infrastructure. Civil construction contractors need intelligent and rugged new technology tools to keep a competitive edge.

Connected software and hardware that get the job done

Managing people, productivity, and progress on a construction site can be a guessing game. Connected technology can help you make informed decisions to keep your project moving forward.

Improve bid estimation accuracy

Ditch the hassle of manual spreadsheets. Win more bids at better margins with centralized estimating software that improves accuracy and streamlines the bid process.

Simplify project management

Build better with the most connected ecosystem for construction management. Connect the field and office with a single source of collaboration and information for all stakeholders.

Boost fleet profitability

Heavy civil equipment is expensive to own and maintain. Access tools that measure costs and performance, turning this cost center into a revenue driver.

Leverage connected field technology solutions

Get the right insight at the right time for the right decision. From smart surveying instruments to augmented and mixed reality data visualization, deliver increased productivity to optimize resources.

Keep jobs on target

Make data-driven decisions in the field. Electronic field logs and reporting provide data in real-time, allowing you to make faster and smarter adjustments–and drive profitability.

Automate HR workflows

Focus on people, not paperwork. Safely and securely automate payroll, onboarding, and auditing and give employees a fast, fully digital onboarding experience they will appreciate.
Customer testimonials

What do civil construction Trimble users say?

We're able to do more work in less time, with greater accuracy, while keeping our indirect expenses the same or even lower.

Shay StutsmanPresident, Stutsman-Gerbaz
Slide 1 of 3

Business Impact

How much time and money do Civil construction companies save with Trimble technology?

Costs

11%
Lower equipment repair costs

Processing time

75%
Less processing time for reports

Savings

$40,000
Annual savings on paper forms
Product recommendation

B2W Product Suite

Enhance your civil estimating, scheduling, tracking, maintenance, and analytics, boosting efficiency and insights with the B2W suite.

B2W Estimate: Win more bids at better margins
B2W Field View: Digital safety data capture and reporting
B2W Employee App: Log labor hours and equipment
B2W Maintain: Equipment and fleet maintenance
B2W Schedule: Real-time resource visibility
Trimble Viewpoint construction management software interfaces, including data charts and reports, shown on a computer monitor and laptop.
Product recommendation

Machine control applications for civil construction

Trimble machine control helps to maximize project budgets by reducing errors, improving data collection, and reducing operator guesswork.

Aerial view of a motor grader and bulldozer using the Trimble Earthworks Grade Control Platform for grading on a dirt construction site.

Start designing in new ways

Isometric 3D illustration of a Trimble digital twin and smart factory on a laptop screen against a dark blue background.
FAQs: Civil construction

Digital twins changing the game in civil construction

Did you know Las Vegas has a digital twin of a 7-square-kilometer section of its downtown? See who is using digital twins for real-time visualization.

A tablet displays a video of Trimble CEO Rob Painter and two presenters on stage during a corporate presentation.
A civil (construction) discussion

Delivering on America’s infrastructure promise

The Bipartisan Infrastructure Law will modernize and upgrade the nation’s transits, highways, ports, and electrical grids. Here’s how.

A tablet displays two Duna Aszfalt workers in safety gear installing yellow Trimble GNSS antennas on a vehicle.
Public-private partnership

One of America’s largest P3 projects

See how a tech-enabled workflow turned a 30-mile stormwater diversion channel into a North Dakota success story.