Skip to content

Villager Construction: a full picture of field performance with B2W Track

2 minute read
| |
December 8, 2023

Share this post:

Replacing a chaotic mix of paper- and spreadsheet-based field tracking processes gave this contractor uniformity, a full picture of job performance daily and a vital estimating-tracking connection.

Related articles

Article

Randselva bridge: closing the gap on drawing‑free design

Randselva Bridge in Norway is the world’s longest bridge to be designed and constructed using only B...
Read full article
Article

How George Leslie is driving productivity through connected construction

Faced with a manual and time-consuming survey data process, with a lack of connectivity between fiel...
Read full article
Article

From raw imagery to hard data: The crucial role of AI in construction documentation

Artificial Intelligence (AI) transforms construction documentation by automatically mapping 360° ima...
Read full article