Skip to content

S.J. Cantwell: collaboration and profitability with B2W Track

2 minute read
|
June 26, 2023

Share this post:

With B2W Track field logs capturing performance data and linking the office and field, teams at this sitework and demolition company review progress vs. plan daily and adjust operations immediately.

Related articles

Article

Randselva bridge: closing the gap on drawing‑free design

Randselva Bridge in Norway is the world’s longest bridge to be designed and constructed using only B...
Read full article
Article

How George Leslie is driving productivity through connected construction

Faced with a manual and time-consuming survey data process, with a lack of connectivity between fiel...
Read full article
Article

From raw imagery to hard data: The crucial role of AI in construction documentation

Artificial Intelligence (AI) transforms construction documentation by automatically mapping 360° ima...
Read full article