Skip to content

Lancaster Development: 95% equipment uptime with B2W Maintain

2 minute read
| |
October 24, 2019

Share this post:

Dan Corbett and his team maintain 500 pieces of heavy equipment for upstate New York highway, bridge and sitework contractor Lancaster Development. In this video, he explains how the move to B2W Track improved preventive maintenance, linked maintenance with field tracking and scheduling and helped drive equipment uptime to 95%.

Related articles

Article

Randselva bridge: closing the gap on drawing‑free design

Randselva Bridge in Norway is the world’s longest bridge to be designed and constructed using only B...
Read full article
Article

How George Leslie is driving productivity through connected construction

Faced with a manual and time-consuming survey data process, with a lack of connectivity between fiel...
Read full article
Article

Five questions to ask before you subscribe

Construction tech subscriptions turn ongoing tech costs into predictable, manageable expenses. Stand...
Read full article